Technical Site Survey

Site survey, evaluate the site

This process was attended by RNP, TNP, Sitac and CME teams.
At this stage, a survey will be conducted in the place where BTS will be built.
After the survey is done, the responsible team should create a Technical Site Survey Report which is distributed to the four teams above (the RNP team, TNP, Sitac and CME) and then evaluated for the BTS site candidate ranking.